Electro – technical section

EEP installation

Position
Installation
Remote control cable
Connection of remote control cable to main board
1PSN MAGLAJYESNO
2EVP ZAVIDOVIĆIYESYES
3PS ŽEPČEYESYES
4PSN BEGOV HANYESYES
5PS NEMILAYESYES
6EVP ZENICAYESYES
7PS DRIVUŠAYESYES
8PSN LAŠVAYESNO
9PS KAKANJYESYES
10EVP DOBRINJEYESYES
11PSN PODLUGOVIYESYES
12PS RAJLOVACYESNO
13PS SARAJEVO (Devastirana oprema)YESNO
14EVP BLAŽUJYESYES
15PS HADŽIĆIYESYES
16PS PAZARIĆYESYES
17PSN IVAN - RAŠTELICAYESYES
18PS BRADINAYESYES
19PS OVČARIYESNO
20EVP KONJIC - OVČARIYESYES
21PS OSTROŽACYESYES
22PSN GRABOVICAYESYES
23PS DREŽNICAYESYES
24EVP RAŠTANIYESNO
25PS MOSTARYESNO
26PS ČAPLJINAYESYES

Contact line (power network)

The total length of the electrified / nonelectrified railways:

  • Electrified railways – 440,927 km
  • Nonelectrified railways – 167,568 km

Signal – safety devices

SIGNAL - SAFETY DEVICE
Unit
Quantity
Complete security of the station with relay SS device (type SEL SprDrL30 or ERICSSON)station/device23
Station secured with relay devicestation/device1
Station secured with mechanical devicestation/device2
Station secured with mechanical devicestation/device4
Stations currently being secured with electronic devicesstation/device6
Automatic Track BlockAPB0
Inter-stationdependencyID distance1
Remote controlled highway crossing systempiece13
Automatic highway crossing system in the station areapiece8
Remote controlled highway crossing system in the station areapiece3
Automatic highway crossing system with track supervision signalspiece3
Highway crossing system with mechanical securitypiece7
Track auto-stopping devicepiece0

Telecommunication facilities

Telecommunication facilities - Google Drive
Telecommunication facilities : List 1